[1]
Sadegheih, A., Nazari, A. and Tehrani, R. 2022. Project scheduling based on resource leveling using fuzzy ranking and genetic algorithm: Examination and analysis. International journal of health sciences. 6, S8 (Jul. 2022), 409–432. DOI:https://doi.org/10.53730/ijhs.v6nS8.10276.